Excavation & Site Prep

No ReKeying — Every Service Agreement Renewed, Every Visit Logged Automatically

Maintenance agreements are your most profitable recurring revenue — and the ones most likely to slip through the cracks. Renewal dates buried in a spreadsheet, missed visits never billed, customers who forgot they had a contract. No ReKeying means every agreement visit is dispatched, logged, and billed without manual follow-through.

Uncle Steve on maintenance agreement tracking in excavation & site prep

The Excavation & Site Prep Industry at a Glance

Site preparation and general excavation contractors — grading, foundation excavation, utility trenching. Every job starts with an 811 ticket.

40,000+

US Companies

$1.5M–$12M

Avg. Revenue

5–30

Field Crew Size

5.5%

Growth Rate

First shovel = first locate ticket. If your morning routine is printing tickets, sorting by crew, and hoping the locates are done, you're running a paper process in a $30-billion-damage industry.

Excavation & Site Prep Industry Data & Research

Key statistics shaping the excavation & site prep market today.

$30 billion annual cost of underground utility damage
Common Ground Alliance, 2024
On-time locate delivery rate is only 30–70% across state 811 centers
CGA DIRT Report, 2024

How Maintenance Agreement Tracking Actually Looks in Excavation & Site Prep

The Scenario

An excavation contractor has annual site maintenance agreements with three commercial clients — pothole patching, catch basin cleaning, and annual grading touch-up. The spring grading visits for two accounts were never scheduled after a coordinator left.

The Real Impact

Missed annual grading visits on commercial site maintenance contracts result in drainage failures, pavement damage, and contract cancellations worth $6,000–$18,000/year per account.

Does This Sound Like Your Excavation & Site Prep Operation?

  • !Maintenance agreement visits get skipped and nobody notices until the customer calls
  • !Renewal dates are tracked in a spreadsheet that someone forgets to check
  • !Agreement customers get treated like one-off jobs — no priority scheduling

The Cost of Doing Nothing

A missed maintenance agreement visit is lost revenue and a broken promise. If 10% of your agreement visits are missed, a $50K/month agreement base leaks $5K/month — $60K/year — in unbilled work.

What Excavation & Site Prep Companies Typically Use

BOSS811HeavyJobB2WProcore

These tools are great at what they do — but they don't eliminate the maintenance agreement tracking gap. That's what we build.

Excavation & Site Prep Operational Challenges

  • 1Every grading and excavation job starts with a locate ticket
  • 2Morning ticket distribution is a paper shuffle
  • 3No real-time visibility into which locates are complete
  • 4Wait time for outstanding locates burns crew and equipment hours

Compliance & Regulations

  • A811 mandatory notification before excavation
  • BOSHA excavation safety (29 CFR 1926 Subpart P)
  • CState-specific locate ticket validity and positive response
  • DStormwater/erosion control documentation
Common roles:Owner/OperatorProject ManagerForemanEquipment Operator

How We Fix Maintenance Agreement Tracking for Excavation & Site Prep — No ReKeying

1

Map Your Workflow

We study exactly where maintenance agreement tracking happens in your excavation & site prep operation — the forms, the handoffs, the re-entry points.

2

Build a Working Prototype

Not a demo. Not a slide deck. A real, functional prototype that eliminates the pain point and works with your existing tools.

3

Prove It Before You Pay

You test the prototype on a real job. If it doesn't eliminate the maintenance agreement tracking problem, you don't pay.

Get No ReKeying for Your Excavation & Site Prep Operation — Free Prototype

Tell us about your operation and we'll build you a working solution — no commitment, no credit card.

No spam. No credit card. Just a prototype that works.

Maintenance Agreement Tracking Problems for Excavation & Site Prep Companies | Simply Connected Systems