Directional Boring & HDD

No Rekeying — Your Field Data Goes Directly Into the Office System

Your techs write it down in the field, then someone types it into the computer back at the office. No Rekeying means every keystroke in the field becomes a digital record automatically — zero double-entry, zero wasted payroll.

Uncle Steve on rekeying data in directional boring & hdd

The Directional Boring & HDD Industry at a Glance

Horizontal directional drilling contractors — trenchless underground utility installation crossing existing utility corridors daily.

12,000+

US Companies

$2M–$15M

Avg. Revenue

5–20

Field Crew Size

6.8%

Growth Rate

Bore logs on paper, locate verifications in camera rolls, 811 tickets printed and sorted by hand. The gap between the drill rig and the office is entirely paper.

Directional Boring & HDD Industry Data & Research

Key statistics shaping the directional boring & hdd market today.

38+ million 811 tickets processed annually in the US
Common Ground Alliance, 2024
Cross-bore remediation costs average $150,000+ per incident
PG&E / GPRS, 2024
CGA Index rose from 94.0 to 96.7 — trending wrong direction
CGA DIRT Report, 2024

How Rekeying Data Actually Looks in Directional Boring & HDD

The Scenario

Bore logs captured on paper in the field are rekeyed into the office system by an admin. Locate ticket numbers are manually matched to project records.

The Real Impact

Every rekeyed bore log is a chance for transcription error — wrong depth, wrong crossing, wrong ticket number.

Does This Sound Like Your Directional Boring & HDD Operation?

  • !Office staff spend hours re-typing technician notes
  • !Errors show up weeks later on invoices
  • !Techs complain the paperwork takes longer than the job

The Cost of Doing Nothing

Every rekeyed record costs $4–$12 in labor and error correction. At 50 jobs/week that is $10K–$30K/year in pure waste. No Rekeying eliminates this entirely — data captured once in the field flows straight to the office.

What Directional Boring & HDD Companies Typically Use

BOSS811UtilocateProcoreHeavyJob

These tools are great at what they do — but they don't eliminate the rekeying data gap. That's what we build.

Directional Boring & HDD Operational Challenges

  • 1Every bore path must be cleared through 811 before drilling
  • 2Cross-bore risk at $150K+ per incident
  • 3Post-construction as-builts required but captured on paper
  • 4Locate ticket expiration requires update/remark management

Compliance & Regulations

  • A811 mandatory notification before excavation (federal)
  • BState-specific locate ticket validity (10–45 days)
  • CPHMSA pipeline safety for gas crossings
  • DUpdate and remark requirements before ticket expiration
Common roles:Owner/OperatorProject ManagerDrill OperatorLocator

How We Deliver No ReKeying for Directional Boring & HDD

1

Map Your Workflow

We study exactly where rekeying data happens in your directional boring & hdd operation — the forms, the handoffs, the re-entry points.

2

Build a Working Prototype

Not a demo. Not a slide deck. A real, functional prototype that eliminates the pain point and works with your existing tools.

3

Prove It Before You Pay

You test the prototype on a real job. If it doesn't eliminate the rekeying data problem, you don't pay.

Get No ReKeying for Your Directional Boring & HDD Operation — Free Prototype

Tell us about your operation and we'll build you a working solution — no commitment, no credit card.

No spam. No credit card. Just a prototype that works.

No Rekeying for Directional Boring & HDD Companies | Simply Connected Systems