Directional Boring & HDD

Ditch the Clipboard — Handwriting Is Costing You Money

Carbon-copy work orders, scribbled inspection sheets, illegible notes. If your crew still writes by hand, you are leaving money and accuracy on the table.

Uncle Steve on handwritten forms in directional boring & hdd

The Directional Boring & HDD Industry at a Glance

Horizontal directional drilling contractors — trenchless underground utility installation crossing existing utility corridors daily.

12,000+

US Companies

$2M–$15M

Avg. Revenue

5–20

Field Crew Size

6.8%

Growth Rate

Bore logs on paper, locate verifications in camera rolls, 811 tickets printed and sorted by hand. The gap between the drill rig and the office is entirely paper.

Directional Boring & HDD Industry Data & Research

Key statistics shaping the directional boring & hdd market today.

38+ million 811 tickets processed annually in the US
Common Ground Alliance, 2024
Cross-bore remediation costs average $150,000+ per incident
PG&E / GPRS, 2024
CGA Index rose from 94.0 to 96.7 — trending wrong direction
CGA DIRT Report, 2024

Does This Sound Like Your Directional Boring & HDD Operation?

  • !Can't read the tech's handwriting
  • !Lost or damaged paper forms
  • !No searchable history of past jobs

The Cost of Doing Nothing

Illegible forms cause billing disputes, warranty gaps, and compliance risk. One misread serial number can cost a $5K callback.

What Directional Boring & HDD Companies Typically Use

BOSS811UtilocateProcoreHeavyJob

These tools are great at what they do — but they don't eliminate the handwritten forms gap. That's what we build.

Directional Boring & HDD Operational Challenges

  • 1Every bore path must be cleared through 811 before drilling
  • 2Cross-bore risk at $150K+ per incident
  • 3Post-construction as-builts required but captured on paper
  • 4Locate ticket expiration requires update/remark management

Compliance & Regulations

  • A811 mandatory notification before excavation (federal)
  • BState-specific locate ticket validity (10–45 days)
  • CPHMSA pipeline safety for gas crossings
  • DUpdate and remark requirements before ticket expiration
Common roles:Owner/OperatorProject ManagerDrill OperatorLocator

How We Fix Handwritten Forms for Directional Boring & HDD — No ReKeying

1

Map Your Workflow

We study exactly where handwritten forms happens in your directional boring & hdd operation — the forms, the handoffs, the re-entry points.

2

Build a Working Prototype

Not a demo. Not a slide deck. A real, functional prototype that eliminates the pain point and works with your existing tools.

3

Prove It Before You Pay

You test the prototype on a real job. If it doesn't eliminate the handwritten forms problem, you don't pay.

Get No ReKeying for Your Directional Boring & HDD Operation — Free Prototype

Tell us about your operation and we'll build you a working solution — no commitment, no credit card.

No spam. No credit card. Just a prototype that works.

Handwritten Forms Problems for Directional Boring & HDD Companies | Simply Connected Systems