Directional Boring & HDD
If You Didn't Photograph It, It Didn't Happen
Before-and-after photos, equipment labels, damage documentation — if your techs take photos but they live in their camera roll, you have no documentation.
Uncle Steve on photo documentation in directional boring & hdd
The Directional Boring & HDD Industry at a Glance
Horizontal directional drilling contractors — trenchless underground utility installation crossing existing utility corridors daily.
12,000+
US Companies
$2M–$15M
Avg. Revenue
5–20
Field Crew Size
6.8%
Growth Rate
Bore logs on paper, locate verifications in camera rolls, 811 tickets printed and sorted by hand. The gap between the drill rig and the office is entirely paper.
Directional Boring & HDD Industry Data & Research
Key statistics shaping the directional boring & hdd market today.
- 38+ million 811 tickets processed annually in the US
- — Common Ground Alliance, 2024
- Cross-bore remediation costs average $150,000+ per incident
- — PG&E / GPRS, 2024
- CGA Index rose from 94.0 to 96.7 — trending wrong direction
- — CGA DIRT Report, 2024
Does This Sound Like Your Directional Boring & HDD Operation?
- !Photos stuck in personal camera rolls
- !No way to link photos to specific jobs
- !Disputes with customers over pre-existing damage
The Cost of Doing Nothing
One undocumented damage dispute can cost $2K–$20K. Multiply by the disputes you can't win without photos.
What Directional Boring & HDD Companies Typically Use
These tools are great at what they do — but they don't eliminate the photo documentation gap. That's what we build.
Directional Boring & HDD Operational Challenges
- 1Every bore path must be cleared through 811 before drilling
- 2Cross-bore risk at $150K+ per incident
- 3Post-construction as-builts required but captured on paper
- 4Locate ticket expiration requires update/remark management
Compliance & Regulations
- A811 mandatory notification before excavation (federal)
- BState-specific locate ticket validity (10–45 days)
- CPHMSA pipeline safety for gas crossings
- DUpdate and remark requirements before ticket expiration
How We Fix Photo Documentation for Directional Boring & HDD — No ReKeying
Map Your Workflow
We study exactly where photo documentation happens in your directional boring & hdd operation — the forms, the handoffs, the re-entry points.
Build a Working Prototype
Not a demo. Not a slide deck. A real, functional prototype that eliminates the pain point and works with your existing tools.
Prove It Before You Pay
You test the prototype on a real job. If it doesn't eliminate the photo documentation problem, you don't pay.
Get No ReKeying for Your Directional Boring & HDD Operation — Free Prototype
Tell us about your operation and we'll build you a working solution — no commitment, no credit card.