Excavation & Site Prep

Your 811 Locate Records Are on Paper. That Is a Liability Problem.

Every dig starts with an 811 ticket. But between the ticket and the field, the digital thread breaks — locate verifications, bore logs, and as-builts end up on paper, in camera rolls, or in filing cabinets.

Uncle Steve on locate documentation in excavation & site prep

The Excavation & Site Prep Industry at a Glance

Site preparation and general excavation contractors — grading, foundation excavation, utility trenching. Every job starts with an 811 ticket.

40,000+

US Companies

$1.5M–$12M

Avg. Revenue

5–30

Field Crew Size

5.5%

Growth Rate

First shovel = first locate ticket. If your morning routine is printing tickets, sorting by crew, and hoping the locates are done, you're running a paper process in a $30-billion-damage industry.

Excavation & Site Prep Industry Data & Research

Key statistics shaping the excavation & site prep market today.

$30 billion annual cost of underground utility damage
Common Ground Alliance, 2024
On-time locate delivery rate is only 30–70% across state 811 centers
CGA DIRT Report, 2024

How Locate Documentation Actually Looks in Excavation & Site Prep

The Scenario

A grading crew shows up at 7 AM. The foreman has a stack of printed 811 tickets. He calls the office to ask which locates are complete. Nobody knows. The crew waits.

The Real Impact

Idle crew time at $500–$2,000/day while waiting for locate confirmations. No digital record of which marks were verified before excavation began.

What the Research Says

On-time locate delivery rate is only 30–70%. $30 billion in annual utility damage costs nationally.

CGA DIRT Report, 2024

Does This Sound Like Your Excavation & Site Prep Operation?

  • !Locate tickets printed and sorted by hand each morning
  • !Locate verification photos stored in personal phone camera rolls
  • !No system tracks ticket expiration — missed update/remark windows
  • !Damage claims require weeks of paper reconstruction

The Cost of Doing Nothing

Underground utility damage costs $30 billion/year nationally. Digging on an expired locate ticket means full repair liability ($10K–$200K+), statutory fines, and voided insurance.

What Excavation & Site Prep Companies Typically Use

BOSS811HeavyJobB2WProcore

These tools are great at what they do — but they don't eliminate the locate documentation gap. That's what we build.

Excavation & Site Prep Operational Challenges

  • 1Every grading and excavation job starts with a locate ticket
  • 2Morning ticket distribution is a paper shuffle
  • 3No real-time visibility into which locates are complete
  • 4Wait time for outstanding locates burns crew and equipment hours

Compliance & Regulations

  • A811 mandatory notification before excavation
  • BOSHA excavation safety (29 CFR 1926 Subpart P)
  • CState-specific locate ticket validity and positive response
  • DStormwater/erosion control documentation
Common roles:Owner/OperatorProject ManagerForemanEquipment Operator

How We Fix Locate Documentation for Excavation & Site Prep — No ReKeying

1

Map Your Workflow

We study exactly where locate documentation happens in your excavation & site prep operation — the forms, the handoffs, the re-entry points.

2

Build a Working Prototype

Not a demo. Not a slide deck. A real, functional prototype that eliminates the pain point and works with your existing tools.

3

Prove It Before You Pay

You test the prototype on a real job. If it doesn't eliminate the locate documentation problem, you don't pay.

Get No ReKeying for Your Excavation & Site Prep Operation — Free Prototype

Tell us about your operation and we'll build you a working solution — no commitment, no credit card.

No spam. No credit card. Just a prototype that works.

Locate Documentation Problems for Excavation & Site Prep Companies | Simply Connected Systems