General Construction
Your Payroll Handoff Is a Weekly Fire Drill
Timesheets come in on paper, get verified by a supervisor, then manually entered into payroll software. Every Friday is a scramble.
The General Construction Industry at a Glance
General contractors and specialty trades — remodeling, renovation, and new build projects.
750,000+
US Companies
$1.5M–$10M
Avg. Revenue
10–50 workers
Field Crew Size
4% annually
Growth Rate
GCs coordinate dozens of subs, phases, and inspections. Daily logs, safety reports, change orders, and draw requests on paper create a documentation nightmare — and when a dispute lands in arbitration, the paper trail decides who pays.
General Construction Industry Data & Research
Key statistics shaping the general construction market today.
- Bad data costs the global construction industry $1.8 trillion per year, with 14% of all rework directly caused by inaccurate information
- — FMI/Autodesk Harnessing the Data Advantage Report, 2024
- Rework consumes 5–10% of total project costs — the median is 9% when including indirect costs
- — CURT/CII Construction Rework Study, 2023
- 35% of construction professionals' time is spent on non-productive activities: searching for information, resolving conflicts, and fixing errors
- — Autodesk/FMI Productivity Report, 2024
- $177 billion is lost annually in U.S. construction due to rework, data searches, and communication breakdowns
- — Trimble Construction Research, 2024
- 70% of contractors have no formal technology roadmap, and 65% cite uncertain payback periods as the chief barrier to digital adoption
- — Deloitte Digital Adoption in Construction, 2025
How Payroll Handoff Actually Looks in General Construction
The Scenario
Certified payroll on a prevailing-wage job requires documenting hours by classification, fringe benefits, and apprentice ratios — collected on paper timesheets from multiple subs.
The Real Impact
Certified payroll errors on public projects trigger DOL audits and can result in debarment — the worst-case outcome for a GC's business.
What the Research Says
“38% of U.S. construction companies still rely on paper timesheets. The calculation error rate can reach 8% of total payroll for paper-based time tracking.”
— SmartBarrel/QuickBooks Construction Payroll Study, 2024
Does This Sound Like Your General Construction Operation?
- !Paychecks are wrong every other week
- !Supervisors spend Friday afternoon chasing timesheets
- !Overtime calculations done by hand
The Cost of Doing Nothing
Payroll errors erode trust with your best people and cost 1–3% of gross payroll in corrections and penalties.
What General Construction Companies Typically Use
These tools are great at what they do — but they don't eliminate the payroll handoff gap. That's what we build.
General Construction Operational Challenges
- 1Change order management across multiple subs and phases
- 2Daily logs and safety documentation required by OSHA and owners
- 3Retainage tracking and draw schedule documentation
- 4Coordinating 5–15 subcontractors with overlapping schedules
Compliance & Regulations
- AOSHA 1926 construction safety standards and daily documentation
- BState contractor licensing and bonding requirements
- CPrevailing wage documentation on public projects (Davis-Bacon)
- DLocal building department permits, inspections, and certificate of occupancy
How We Fix Payroll Handoff for General Construction
Map Your Workflow
We study exactly where payroll handoff happens in your general construction operation — the forms, the handoffs, the re-entry points.
Build a Working Prototype
Not a demo. Not a slide deck. A real, functional prototype that eliminates the pain point and works with your existing tools.
Prove It Before You Pay
You test the prototype on a real job. If it doesn't eliminate the payroll handoff problem, you don't pay.
Real Results: General Construction Companies That Went Paperless
What happens when general construction businesses eliminate manual processes and paper forms.
TD Construction Testing
Replaced paper test reports with digital data capture apps; clients receive results same-day instead of waiting a week
£30,000/year saved; 80% reduction in admin time
Source: FlowForma Construction Case Study
Global Scaffolding & Maintenance Co.
Moved all safety forms, inspection checklists, and work permits to digital; eliminated physical form storage entirely
£300K/year saved in development; nearly £3M in paper costs eliminated
Source: FlowForma Enterprise Case Study
Industry Benchmark (Autodesk/FMI)
GCs adopting digital daily logs and inspection forms reduced non-productive professional time from 35% to under 20%
14+ hours/week reclaimed per PM; 65% first-year ROI on digital forms investment
Source: FMI/Autodesk Construction Productivity Report
Get a Free Prototype for Your General Construction Payroll Handoff Problem
Tell us about your operation and we'll build you a working solution — no commitment, no credit card.
Payroll Handoff Solutions for Other Industries
HVAC
Payroll Handoff
Plumbing
Payroll Handoff
Electrical
Payroll Handoff
Landscaping & Lawn Care
Payroll Handoff