Directional Boring & HDD Change Order Management

A tech discovers extra scope on-site — a corroded pipe, an unplanned material upgrade, an additional hour of labor. He calls it in verbally. The customer nods. The invoice comes out two weeks later with line items nobody recognizes. Zero Double Entry means scope changes captured in the field flow directly to the invoice with a digital approval trail.

Watch: Uncle Steve Explains Change Order Management for Directional Boring & HDD

Executive Summary: Change Order Management Gaps in Directional Boring & HDD Operations

Key Finding: Independent workflow analysis indicates that unresolved change order management issues in Directional Boring & HDD operations hinder efficiency. Research shows that Contractors write off up to $15,000 annually in unbilled scope changes due to missing on-site digital signatures and approval trails [1].

The Directional Boring & HDD Industry at a Glance

Horizontal directional drilling contractors — trenchless underground utility installation crossing existing utility corridors daily.

12,000+

US Companies

$2M–$15M

Avg. Revenue

5–20

Field Crew Size

6.8%

Growth Rate

Bore logs on paper, locate verifications in camera rolls, 811 tickets printed and sorted by hand. The gap between the drill rig and the office is entirely paper.

Change Order Management — Reference Data & Research

Objective third-party statistics and research benchmarks relative to change order management and directional boring & hdd workflows.

[1] Contractors write off up to $15,000 annually in unbilled scope changes due to missing on-site digital signatures and approval trails.
AGC Contractor Management Survey, 2024
[2] 38+ million 811 tickets processed annually in the US
Common Ground Alliance, 2024
[3] Cross-bore remediation costs average $150,000+ per incident
PG&E / GPRS, 2024
[4] CGA Index rose from 94.0 to 96.7 — trending wrong direction
CGA DIRT Report, 2024

How Change Order Management Actually Looks in Directional Boring & HDD

The Scenario

A boring crew encounters unmarked rock formation mid-bore that requires core bits not in the original equipment manifest — adding $1,800 in tooling and 6 hours of extra time. The operator calls the PM. Verbal authorization given. The GC disputes the line item at final payment.

The Real Impact

Subsurface change orders on directional boring jobs are the most commonly disputed line items — especially on public works projects where change order documentation is contractually required for payment.

Does This Sound Like Your Directional Boring & HDD Operation?

  • !Customers dispute invoice line items they don't recall approving
  • !Verbal scope approvals don't hold up when the customer pushes back
  • !Techs add scope without realizing it needs a separate authorization

The Cost of Doing Nothing

Undocumented change orders are the #1 source of invoice disputes. The average disputed amount is $1,200–$4,000 per incident. At 5 disputes per month, that is $72K–$240K/year in contested revenue.

What Directional Boring & HDD Companies Typically Use

These tools are great at what they do — but they don't eliminate the change order management gap. That's what we build.

Directional Boring & HDD Operational Challenges

  • 1Every bore path must be cleared through 811 before drilling
  • 2Cross-bore risk at $150K+ per incident
  • 3Post-construction as-builts required but captured on paper
  • 4Locate ticket expiration requires update/remark management

Compliance & Regulations

  • A811 mandatory notification before excavation (federal)
  • BState-specific locate ticket validity (10–45 days)
  • CPHMSA pipeline safety for gas crossings
  • DUpdate and remark requirements before ticket expiration
Common roles:Owner/OperatorProject ManagerDrill OperatorLocator

How We Fix Change Order Management for Directional Boring & HDD — No ReKeying

1

Map Your Workflow

We study exactly where change order management happens in your directional boring & hdd operation — the forms, the handoffs, the re-entry points.

2

Build a Working Prototype

Not a demo. Not a slide deck. A real, functional prototype that eliminates the pain point and works with your existing tools.

3

Prove It Before You Pay

You test the prototype on a real job. If it doesn't eliminate the change order management problem, you don't pay.

Step-by-Step Guide

How to Fix Change Order Management in Directional Boring & HDD — 6 Steps

A practical walkthrough of exactly how to eliminate this problem in your operation.

Read the Guide →
Real Customer Success

Proven to Save Time and Remove Chaos

See how industry professionals are using our platform to consolidate systems, eliminate double-entry, and streamline their daily field operations.

5.0 Rating
"Simply Connected made it much easier to manage everything in one place. Having our systems integrated into a single platform has saved time and eliminated a lot of the back and forth we used to deal with. The team was responsive throughout the process. Everything has worked as expected, and the overall experience has been very positive."
CW
Cody WagnerVerified Customer
onGoogle Maps

Frequently Asked Questions

Common questions about change order management in Directional Boring & HDD field service operations.

Fix Change Order Management in Your Directional Boring & HDD Operation — Free Prototype

Tell us about your operation and we'll build you a working solution — no commitment, no credit card.

No spam. No credit card. Just a prototype that works.