Directional Boring & HDD

No ReKeying — Every Tech Arrives Knowing the Full History of That Unit

When a tech arrives at a site, the unit's full service history should be in their hand — not in a binder in the machine room or in a retired tech's memory. No ReKeying means every field entry becomes a permanent digital record linked to that specific equipment serial number.

Uncle Steve on equipment service history in directional boring & hdd

The Directional Boring & HDD Industry at a Glance

Horizontal directional drilling contractors — trenchless underground utility installation crossing existing utility corridors daily.

12,000+

US Companies

$2M–$15M

Avg. Revenue

5–20

Field Crew Size

6.8%

Growth Rate

Bore logs on paper, locate verifications in camera rolls, 811 tickets printed and sorted by hand. The gap between the drill rig and the office is entirely paper.

Directional Boring & HDD Industry Data & Research

Key statistics shaping the directional boring & hdd market today.

38+ million 811 tickets processed annually in the US
Common Ground Alliance, 2024
Cross-bore remediation costs average $150,000+ per incident
PG&E / GPRS, 2024
CGA Index rose from 94.0 to 96.7 — trending wrong direction
CGA DIRT Report, 2024

How Equipment Service History Actually Looks in Directional Boring & HDD

The Scenario

A boring rig breaks down mid-bore on a $40,000 municipal job. The crew doesn't know when the drill head was last inspected or whether the mud pump was flagged for service at the previous job. Diagnosis from scratch adds 4 hours of idle crew time.

The Real Impact

Equipment breakdowns on boring jobs idle crews at $800–$2,000/day and risk job penalties for missing contractual completion windows. Service history access prevents known-issue breakdowns.

Does This Sound Like Your Directional Boring & HDD Operation?

  • !Techs arrive with no knowledge of what was done to the unit last time
  • !Service history is split across paper binders, emails, and one person's memory
  • !Repeated diagnostics on the same unit because nobody documented the root cause

The Cost of Doing Nothing

Arriving without unit history adds 45–90 minutes of diagnostic re-work per service call. At $100/hour and 3 such calls per tech per week, that is $15K–$23K/year in wasted labor per technician.

What Directional Boring & HDD Companies Typically Use

BOSS811UtilocateProcoreHeavyJob

These tools are great at what they do — but they don't eliminate the equipment service history gap. That's what we build.

Directional Boring & HDD Operational Challenges

  • 1Every bore path must be cleared through 811 before drilling
  • 2Cross-bore risk at $150K+ per incident
  • 3Post-construction as-builts required but captured on paper
  • 4Locate ticket expiration requires update/remark management

Compliance & Regulations

  • A811 mandatory notification before excavation (federal)
  • BState-specific locate ticket validity (10–45 days)
  • CPHMSA pipeline safety for gas crossings
  • DUpdate and remark requirements before ticket expiration
Common roles:Owner/OperatorProject ManagerDrill OperatorLocator

How We Fix Equipment Service History for Directional Boring & HDD — No ReKeying

1

Map Your Workflow

We study exactly where equipment service history happens in your directional boring & hdd operation — the forms, the handoffs, the re-entry points.

2

Build a Working Prototype

Not a demo. Not a slide deck. A real, functional prototype that eliminates the pain point and works with your existing tools.

3

Prove It Before You Pay

You test the prototype on a real job. If it doesn't eliminate the equipment service history problem, you don't pay.

Get No ReKeying for Your Directional Boring & HDD Operation — Free Prototype

Tell us about your operation and we'll build you a working solution — no commitment, no credit card.

No spam. No credit card. Just a prototype that works.

Equipment Service History Problems for Directional Boring & HDD Companies | Simply Connected Systems