Pipeline Construction

No Rekeying — Your Field Data Goes Directly Into the Office System

Your techs write it down in the field, then someone types it into the computer back at the office. No Rekeying means every keystroke in the field becomes a digital record automatically — zero double-entry, zero wasted payroll.

Uncle Steve on rekeying data in pipeline construction

The Pipeline Construction Industry at a Glance

Oil and gas pipeline construction contractors — installation through congested utility corridors with high-consequence damage exposure.

5,000+

US Companies

$10M–$100M

Avg. Revenue

15–80

Field Crew Size

4.1%

Growth Rate

Paper-based verification records that don't survive audits, GPS as-built data digitized weeks later. On a pipeline project, digging on an expired ticket is a safety problem.

Pipeline Construction Industry Data & Research

Key statistics shaping the pipeline construction market today.

Natural gas facilities account for ~40% of all underground utility damage
CGA DIRT Report, 2024
$30 billion annual cost of underground utility damage in the US
Common Ground Alliance, 2024

Does This Sound Like Your Pipeline Construction Operation?

  • !Office staff spend hours re-typing technician notes
  • !Errors show up weeks later on invoices
  • !Techs complain the paperwork takes longer than the job

The Cost of Doing Nothing

Every rekeyed record costs $4–$12 in labor and error correction. At 50 jobs/week that is $10K–$30K/year in pure waste. No Rekeying eliminates this entirely — data captured once in the field flows straight to the office.

What Pipeline Construction Companies Typically Use

BOSS811ProcoreHeavyJobInspectAll

These tools are great at what they do — but they don't eliminate the rekeying data gap. That's what we build.

Pipeline Construction Operational Challenges

  • 1Gas pipelines are the #2 damaged underground utility (~40% of incidents)
  • 2PHMSA compliance requires documented locate verification
  • 3High-consequence damage — gas leaks, explosions, federal investigation
  • 4Multiple utility crossings per pipeline segment

Compliance & Regulations

  • APHMSA pipeline safety regulations (49 CFR 192/195)
  • B811 mandatory notification before excavation
  • CState pipeline safety office requirements
  • DDOT One-Call compliance
Common roles:Project ManagerSafety ManagerPipeline SuperintendentForeman

How We Deliver No ReKeying for Pipeline Construction

1

Map Your Workflow

We study exactly where rekeying data happens in your pipeline construction operation — the forms, the handoffs, the re-entry points.

2

Build a Working Prototype

Not a demo. Not a slide deck. A real, functional prototype that eliminates the pain point and works with your existing tools.

3

Prove It Before You Pay

You test the prototype on a real job. If it doesn't eliminate the rekeying data problem, you don't pay.

Get No ReKeying for Your Pipeline Construction Operation — Free Prototype

Tell us about your operation and we'll build you a working solution — no commitment, no credit card.

No spam. No credit card. Just a prototype that works.

No Rekeying for Pipeline Construction Companies | Simply Connected Systems