Fiber & Telecom Installation

No Rekeying — Your Field Data Goes Directly Into the Office System

Your techs write it down in the field, then someone types it into the computer back at the office. No Rekeying means every keystroke in the field becomes a digital record automatically — zero double-entry, zero wasted payroll.

Uncle Steve on rekeying data in fiber & telecom installation

The Fiber & Telecom Installation Industry at a Glance

Fiber optic and telecommunications line construction — underground cable laying, conduit installation, and fiber-to-the-home buildouts.

3,400+

US Companies

$5M–$50M

Avg. Revenue

10–50

Field Crew Size

12.4%

Growth Rate

Hundreds of tickets per mile, status tracked in spreadsheets, placement logs on paper. Telecom is the most damaged underground utility.

Fiber & Telecom Installation Industry Data & Research

Key statistics shaping the fiber & telecom installation market today.

Telecom/fiber is the #1 damaged underground facility type — ~50% of all incidents
CGA DIRT Report, 2024
BEAD Act is pushing $42.5 billion into broadband/fiber buildout
NTIA, 2024

Does This Sound Like Your Fiber & Telecom Installation Operation?

  • !Office staff spend hours re-typing technician notes
  • !Errors show up weeks later on invoices
  • !Techs complain the paperwork takes longer than the job

The Cost of Doing Nothing

Every rekeyed record costs $4–$12 in labor and error correction. At 50 jobs/week that is $10K–$30K/year in pure waste. No Rekeying eliminates this entirely — data captured once in the field flows straight to the office.

What Fiber & Telecom Installation Companies Typically Use

BOSS811UtilocateProcoreTrimble

These tools are great at what they do — but they don't eliminate the rekeying data gap. That's what we build.

Fiber & Telecom Installation Operational Challenges

  • 1Telecom is the #1 damaged underground facility type (~50% of incidents)
  • 2Hundreds of locate tickets per mile of fiber build
  • 3GIS as-built updates lag weeks behind actual construction
  • 4BEAD Act pushing $42.5B into broadband

Compliance & Regulations

  • A811 mandatory notification before excavation
  • BState-specific locate ticket validity (10–45 days)
  • CFCC broadband deployment documentation
  • DBEAD Act compliance and reporting requirements
Common roles:Project ManagerConstruction ManagerSplicerForeman

How We Deliver No ReKeying for Fiber & Telecom Installation

1

Map Your Workflow

We study exactly where rekeying data happens in your fiber & telecom installation operation — the forms, the handoffs, the re-entry points.

2

Build a Working Prototype

Not a demo. Not a slide deck. A real, functional prototype that eliminates the pain point and works with your existing tools.

3

Prove It Before You Pay

You test the prototype on a real job. If it doesn't eliminate the rekeying data problem, you don't pay.

Get No ReKeying for Your Fiber & Telecom Installation Operation — Free Prototype

Tell us about your operation and we'll build you a working solution — no commitment, no credit card.

No spam. No credit card. Just a prototype that works.

No Rekeying for Fiber & Telecom Installation Companies | Simply Connected Systems