Fiber & Telecom Installation
No Rekeying — Your Field Data Goes Directly Into the Office System
Your techs write it down in the field, then someone types it into the computer back at the office. No Rekeying means every keystroke in the field becomes a digital record automatically — zero double-entry, zero wasted payroll.
Uncle Steve on rekeying data in fiber & telecom installation
The Fiber & Telecom Installation Industry at a Glance
Fiber optic and telecommunications line construction — underground cable laying, conduit installation, and fiber-to-the-home buildouts.
3,400+
US Companies
$5M–$50M
Avg. Revenue
10–50
Field Crew Size
12.4%
Growth Rate
Hundreds of tickets per mile, status tracked in spreadsheets, placement logs on paper. Telecom is the most damaged underground utility.
Fiber & Telecom Installation Industry Data & Research
Key statistics shaping the fiber & telecom installation market today.
- Telecom/fiber is the #1 damaged underground facility type — ~50% of all incidents
- — CGA DIRT Report, 2024
- BEAD Act is pushing $42.5 billion into broadband/fiber buildout
- — NTIA, 2024
Does This Sound Like Your Fiber & Telecom Installation Operation?
- !Office staff spend hours re-typing technician notes
- !Errors show up weeks later on invoices
- !Techs complain the paperwork takes longer than the job
The Cost of Doing Nothing
Every rekeyed record costs $4–$12 in labor and error correction. At 50 jobs/week that is $10K–$30K/year in pure waste. No Rekeying eliminates this entirely — data captured once in the field flows straight to the office.
What Fiber & Telecom Installation Companies Typically Use
These tools are great at what they do — but they don't eliminate the rekeying data gap. That's what we build.
Fiber & Telecom Installation Operational Challenges
- 1Telecom is the #1 damaged underground facility type (~50% of incidents)
- 2Hundreds of locate tickets per mile of fiber build
- 3GIS as-built updates lag weeks behind actual construction
- 4BEAD Act pushing $42.5B into broadband
Compliance & Regulations
- A811 mandatory notification before excavation
- BState-specific locate ticket validity (10–45 days)
- CFCC broadband deployment documentation
- DBEAD Act compliance and reporting requirements
How We Deliver No ReKeying for Fiber & Telecom Installation
Map Your Workflow
We study exactly where rekeying data happens in your fiber & telecom installation operation — the forms, the handoffs, the re-entry points.
Build a Working Prototype
Not a demo. Not a slide deck. A real, functional prototype that eliminates the pain point and works with your existing tools.
Prove It Before You Pay
You test the prototype on a real job. If it doesn't eliminate the rekeying data problem, you don't pay.
Get No ReKeying for Your Fiber & Telecom Installation Operation — Free Prototype
Tell us about your operation and we'll build you a working solution — no commitment, no credit card.