Your 811 Locate Records Are on Paper. That Is a Liability Problem.
Every dig starts with an 811 ticket. But between the ticket and the field, the digital thread breaks — locate verifications, bore logs, and as-builts end up on paper, in camera rolls, or in filing cabinets.
Uncle Steve on locate documentation in fiber & telecom installation
The Fiber & Telecom Installation Industry at a Glance
Fiber optic and telecommunications line construction — underground cable laying, conduit installation, and fiber-to-the-home buildouts.
3,400+
US Companies
$5M–$50M
Avg. Revenue
10–50
Field Crew Size
12.4%
Growth Rate
Hundreds of tickets per mile, status tracked in spreadsheets, placement logs on paper. Telecom is the most damaged underground utility.
Fiber & Telecom Installation Industry Data & Research
Key statistics shaping the fiber & telecom installation market today.
- Telecom/fiber is the #1 damaged underground facility type — ~50% of all incidents
- — CGA DIRT Report, 2024
- BEAD Act is pushing $42.5 billion into broadband/fiber buildout
- — NTIA, 2024
How Locate Documentation Actually Looks in Fiber & Telecom Installation
The Scenario
A fiber crew places 2,000 feet of conduit on a FTTH build. Paper placement logs, hand-drawn splice records, and hundreds of locate tickets tracked in a spreadsheet.
The Real Impact
When a cable company reports a hit 2 months later, the defense record has to be reconstructed. The GIS gap means the utility map doesn't reflect reality.
What the Research Says
“Telecom is the most damaged underground facility type — nearly 50% of all reported incidents.”
— CGA DIRT Report, 2024
Does This Sound Like Your Fiber & Telecom Installation Operation?
- !Locate tickets printed and sorted by hand each morning
- !Locate verification photos stored in personal phone camera rolls
- !No system tracks ticket expiration — missed update/remark windows
- !Damage claims require weeks of paper reconstruction
The Cost of Doing Nothing
Underground utility damage costs $30 billion/year nationally. Digging on an expired locate ticket means full repair liability ($10K–$200K+), statutory fines, and voided insurance.
What Fiber & Telecom Installation Companies Typically Use
These tools are great at what they do — but they don't eliminate the locate documentation gap. That's what we build.
Fiber & Telecom Installation Operational Challenges
- 1Telecom is the #1 damaged underground facility type (~50% of incidents)
- 2Hundreds of locate tickets per mile of fiber build
- 3GIS as-built updates lag weeks behind actual construction
- 4BEAD Act pushing $42.5B into broadband
Compliance & Regulations
- A811 mandatory notification before excavation
- BState-specific locate ticket validity (10–45 days)
- CFCC broadband deployment documentation
- DBEAD Act compliance and reporting requirements
How We Fix Locate Documentation for Fiber & Telecom Installation — No ReKeying
Map Your Workflow
We study exactly where locate documentation happens in your fiber & telecom installation operation — the forms, the handoffs, the re-entry points.
Build a Working Prototype
Not a demo. Not a slide deck. A real, functional prototype that eliminates the pain point and works with your existing tools.
Prove It Before You Pay
You test the prototype on a real job. If it doesn't eliminate the locate documentation problem, you don't pay.
Get No ReKeying for Your Fiber & Telecom Installation Operation — Free Prototype
Tell us about your operation and we'll build you a working solution — no commitment, no credit card.
Locate Documentation Solutions for Other Industries
HVAC
Locate Documentation
Plumbing
Locate Documentation
Electrical
Locate Documentation
General Construction
Locate Documentation